July 29, 2010 by Schmitt DC Construction
This slideshow requires JavaScript.
Posted in Framing | Leave a Comment »
July 19, 2010 by Schmitt DC Construction
Posted in Plumbing | Leave a Comment »
July 14, 2010 by Schmitt DC Construction
July 13, 2010 by Schmitt DC Construction
Posted in Concrete Work | Leave a Comment »
Posted in Demolition | Leave a Comment »
June 25, 2010 by Schmitt DC Construction
Second Story Bay Window
Solimar Beach House – View from the second story.
Older Posts »